Prefabricated Cafe and Game Hall Construction

Cafe and Game Hall project example

Prefabricated space that fits how your business works

In a cafe or game hall, how people move inside matters as much as the floor area. Seating areas, the service counter, equipment placement and entrances should be planned so they do not get in each other's way. A short list of needs describing how the business will operate makes choosing the building easier.

For commercial building requests across Türkiye, we look at capacity, intended use and site conditions together. Kitchen or service areas, wet areas and utility needs are defined separately from the general building scope.

From our projects

Gallery

Layout and utilities for commercial use

In commercial spaces such as a cafe or game hall, the layout is built around seating and service flow. The position of the kitchen or bar directly affects plumbing costs; wet areas are grouped side by side wherever possible.

The electrical load in these buildings differs from a home. Once refrigerators, cooktops, air conditioners and game equipment are added up, the capacity of the distribution board is chosen accordingly from the start. Entrances, escape routes and toilet access are part of the official permit process, and we draw up the plan according to these rules.

Service flowWhen customer and staff routes are planned so they do not cross, the space is used more efficiently.Electrical loadA distribution board chosen without totaling the commercial equipment will fall short on the first busy day.Permits and escape routesEntrance width, escape routes and the number of wet areas are checked during the permit process.

Key points in planning a commercial space

  • 1Capacity and circulationState the approximate number of people, the number of tables or equipment and the type of service. How the entrance, seating and work areas connect should be visible on the plan.
  • 2Electricity, water and ventilationShare the utility needs of the equipment and service area from the start. Review the scope of the building's internal utilities and the site connections separately.
  • 3Interior and outdoor spaceClarify which work item covers needs such as finishes, windows and doors, outdoor seating and signage. Construction and operating requirements should also be addressed specifically for the project.
Prefab house with a veranda

Frequently asked questions

Get a quote for your project

Share your plot location and the building you have in mind.

Call WhatsApp