Mon - Sat, 08:00 - 18:00
  • Türkçe
  • English
  • Deutsch
  • العربية

Escalators and Fire Escape Stairs in Bartın

Interior staircase project
Structural strengthening work
Bartın Yapı ÇözümleriEscalators and Fire Escapes

Special installation requests in existing buildings

Escalator and fire escape requests are handled together with the condition of the existing building and the technical requirements. The equipment itself, preparing the area where it will be installed, and the connection work to the building are separate items and are separated at the first meeting.

For requests across Türkiye, photos of the building, floor heights and how it is used are needed for the initial assessment. Equipment supply, structural work and installation are shown separately in the quote; official requirements are assessed for each project.

From our projects

Gallery

Escape routes and mechanical installation

A fire escape is designed to the width, step dimensions and escape distance defined in the regulations. These dimensions are not a matter of choice; they are the first things checked during inspection.

For escalators and similar mechanical systems, the structural connection points and their fit with the existing building are measured in advance. Power supply, maintenance access and the position of the emergency stop are part of the installation plan.

Regulation dimensionsWidth, steps and escape distance are the first items checked during inspection.Structural fitThe points where the mechanical system will connect are determined by measuring the existing building.Maintenance accessThe installation plan also accounts for maintenance access in the years ahead.

Information that defines the scope of a special installation

  • 1Area and dimensionsThe dimensions of the area where the stairs will go, floor heights and existing openings are the starting information. Photos and any drawings should be shared.
  • 2Equipment and structureFor an escalator, equipment supply, and for a fire escape, the steel structure and connection details are separate items. Tell us which items you need.
  • 3Requirements and useThe use of the building and the relevant technical requirements are assessed for each project. Whether the building will stay in use during the work is taken into account in planning.
Living room renovation project

Frequently asked questions

It is assessed using photos of the building, floor dimensions and the condition of the facade. Connection and structural details are confirmed at the design stage.

Get a quote for your project.

Share your plot location and the building you have in mind.

Call WhatsApp